From: route@monster.com
Sent: Monday, October 26, 2015 10:59 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tseter
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
JT Woods jtwoods@gmail.com / (425) 623-5001/
www.linkedin.com/in/jtwoods99 110 N. 104th St. Apt #7, Seattle, WA 98133 SUMMARY · Project management in E911 Phase I and Phase II
integrations for GSM/TDMA and UMTS technologies, IT and Telecom
Infrastructure (Fiber backbone, Microwave, Radio) and TDM network. · Proficient in BMC Remedy, SAP, Siterra+, Granite
XNG, Primavera, Clarity, Serena Mariner PPM, MS Office Tools 2010, Web
Library and Sharepoint administration. · Provide management expertise and solid solutions to
IT/Telecom infrastructure jobs using project management practices, techniques
and standards. · Translates project requirements into objectives and
tasks, manages task assignment to work stream resources and drives task
completion with an appropriate sense of urgency by using demonstrated
knowledge in communications systems and network design, managing
multi-million dollar software projects and programs. · Conducts project meetings, sets and manages client
expectations, facilitates resolution of complex issues and consistently
employs best practices. · Sound knowledge of project management tools and
techniques, including up-to-date knowledge of industry standards and best
practices and ability to tailor tools and techniques based on customer needs EXPERIENCE Triad Group (Contractor at Verizon Wireless)
Bellevue, WA
12/2012-4/2013 Senior Project Manager/ Program Manager · Program managed large-scale project that migrated
40+ LTE network tools into one vendor hosted database, (Siterra +) including:
scheduling, budget management, reporting and vendor/resource management. · Managed the transition of DCAFT LTE reporting tool
from the southern region to Network Support Systems to include development of
project charter, documentation of current DCAFT processes for enhancement
requests/supported requests and creation of new processes for requests. · Oversaw installation of ALU SDM (Subscriber Data
Management) system affecting the Network Support System LTE tools. · Tracked budgeting information and schedules using
Clarity, Excel and MS Project and provided weekly reporting on project
health. · Created monthly financial forecasts and status reports
to ensure projects were timely, in projected scope; provided weekly status
reports to management. · Managed the implementation of pre-defined network
security protocols including penetration testing of third party vendors of
both SFTP and production servers. · Oversaw security risk assessments, lessons learned,
and liaised with network security and network engineering in order to create
appropriate and relevant designs, processes, procedures and documentation. · Held weekly meetings with engineers and vendors to
ensure project scope and tasks were accurately understood and correctly
scheduled. · Reviewed project deliverables for accuracy, apprised
management of issues affecting project status and offered solutions to any
identified issues. Puget Sound Energy (PSE), Redmond,
WA
2/2010-4/2012 Telecom Project Manager ·
Managed large-scale telecommunications
projects within PSE’s network including private fiber, microwave, radio and
leased lines to ensure connectivity for day-to-day operations and monitoring
of analog SCADA/IP SCADA for over 400 PSE substations. · Tracked budgeting information and schedules using
SAP, Serena Mariner and Primavera PPM tools to provide weekly reports to
management on project health status. · Created monthly financial forecasts and monthly
status reports to ensure projects were timely and within projected scope for
IT business office, PSE Operations, project management and CIO. · Network security installing hardware and software
firewalls at substations to PSE’s private fiber network. · Partnered with network security to implemented
standard network security policies and procedures and risk assessments.
· Assisted in policy and procedure establishment in
telecom engineering dept to streamline workflow from project conception to
completion and provided resource allocation data for the telecom department
on all projects. · Interfaced with a wide range of people from
individual contributor to executive levels in all areas affected by a
project, including end users, service organizations, vendors and implementation
partners. · Thorough understanding of energy utility terminology
and regulations as well as NERC CIP policy. AIM Technical Consultants (Contractor at T-Mobile),
Bothell,
WA
2/2008-5/2009 Infrastructure Project Manager · Managed the deployment of T-Mobile retail stores
infrastructure to include installation of data and voice lines for classic
stores, playground stores, and T-Mobile kiosks. · Successfully deployed T-Mobile's @home2 (microcell)
router and in store video tech chat programs across 300 national retail
stores. · Supervised vendors during installation of network
and phone equipment led all troubleshooting efforts. · Managed implementation firewalls (both hardware and
software) for T-Mobile stores and kiosks. Set standards and procedures
for network security policies. · Managed the Network Engineering team to plan,
document and implement VPN firewalls. · Created and tracked purchase orders for phone and
network equipment as well as installation vendor payments. · Initiated and drove daily and weekly conference
calls, including lease signings, construction status, local exchange carrier
CKT status, and deployment go/no updates. Worked closely with equipment
vendors and construction project managers, ensuring project deadlines were
efficiently met and project costs were under budget. · Oversaw 4 national teams installing network
routers and switches, touch screen computers, Nortel phone systems, and video
TV walls. AT&T Mobility, Redmond,
WA
3/2007-2/2008 IT Project Manager · Developed and directed Knowledge Management solution
for AT&T Mobility’s Network Information Systems group, saving AT&T
Mobility $1.78M annually and used by more than 450 people. · Oversaw security risk assessments, lessons learned,
and liaised with network security and network engineering in order to create
appropriate and relevant designs, processes, procedures and documentation. · Managed existing and new core AT&T Mobility
systems used by thousands of users. · Microsoft SharePoint Administrators for network IS
group, oversaw 12 unique SharePoint websites for AT&T mobility. · Established best practices for SharePoint website
design to promote uniformity and improved usability. · Coordinated new training platform for AT&T
Mobility’s NIS group that combined 4 separate systems into one. · Designed new, customized training courses saving
AT&T Mobility $548,000 annual dollars in lost productivity. inCode Telecommunications, (Consultant at Cingular
Wireless), Redmond, WA
7/2004-3/2007 E911 Project Manager · Managed E911 Phase I and Phase II deployments and
Public Safety Access Point integration for the Western and Northeastern
regions. · Collaborated with teams in RF Engineering and
Transport Engineering to confirm cell data and trunks were ordered timely. · Drove weekly meetings with vendors and team members
to confirm schedule compliance and goal. Supervised vendor teams and drive
tester teams to ensure MPC and ALI databases were loaded properly and call
routing verification was completed by PSAP. · Provided technical assistance and troubleshooting
during deployment to streamline testing and make certain that FCC deadlines
were either on time or early. · Partnered with accounting to ensure the project
budget was maintained and vendors were paid timely and accurately. TEKsystems, (Contractor,
AT&T Wireless), Redmond,
WA
5/2003-7/2004
Transport
Engineer
· Verified and built new transport records in
database. Designed and provisioned 3G ckts through AMU equipment and documented
E911 PSAP ckts as required for E911 network. · Provided ED path to switch for wiring through AMU
equipment. Supervised outside vendors and coordinated installation and
testing with vendors, LECs, and switch for all TDMA and GSM ckts. · Performed an audit of transport engineering database
(a Granite systems OSS), transport engineering records, and reconciled
transport engineering database with LEC billing/inventory record sets to
ensure data integrity. · Maintained transport engineering database records,
achieving a 97% accuracy rate for 2003. Placed and monitored T3, T1, and PSTN
move and disconnect orders to decommission legacy switching equipment/network
as defined as surplus by the planning group. · Established new trunk groups per the transport
engineering and LEC reports. Issued and monitored LEC orders. Helped maintain
transport engineering database records. Verified and built new transport
records on database and made DACS cross connect and switch DS1 assignments. JT
Woods
jtwoods@gmail.com / (425) 623-5001 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|